Maria Hastings Elementary School


Location: 7 Crosby Road Lexington, MA 02421

Completed: 2020

Category: Education

Type:  Elementary School

Architect: DiNisco Design Architects & Planners 

General Contractor: Walsh Brothers Inc.

Description: The new building construction is adjacent to the existing Hastings School and was finished in the February of 2021.

Bass Installed components/systems -completed 2020

  • Bass Rainscreen 2000 – Alpolic Aluminum Composite material

  • Porcelanosa Porcelain Wall Panel System

  • Fabral – Concealed & Exposed Fastener Corrugated Wall Panels

  • Fabral – Vented Metal Soffit Panels

  • Custom Metal Flashings & Fascia

  • Roxul Mineral Wool Insulation & Sub framing

Reference: Bass Metals