Maria Hastings Elementary School

Location: 7 Crosby Road Lexington, MA 02421
Completed: 2020
Category: Education
Type: Elementary School
Architect: DiNisco Design Architects & Planners
General Contractor: Walsh Brothers Inc.
Description: The new building construction is adjacent to the existing Hastings School and was finished in the February of 2021.
Bass Installed components/systems -completed 2020
Bass Rainscreen 2000 – Alpolic Aluminum Composite material
Porcelanosa Porcelain Wall Panel System
Fabral – Concealed & Exposed Fastener Corrugated Wall Panels
Fabral – Vented Metal Soffit Panels
Custom Metal Flashings & Fascia
Roxul Mineral Wool Insulation & Sub framing
Reference: Bass Metals